地基验槽(坑)记录 SH/T 3503-J201 工程名称: Project: 单元名称: Unit: Foundation Pit Inspection Record Inspection Location Construction Drawing No. Excavation Dimensions 1. The excavation of foundation pit is performed to Course ______ indicated in the survey report. The bearing course is Course__________. 2. The absolute altitude and relative elevation of the bottom of the foundation pit are Pit Inspection __________________________________ respectively. 3. Soil conditions________________________________________________. 4. Pile location_______, pile type________, quantity ________; The bearing capacity meets the design requirements. 5. Others________________________________________________________. Attached: □Construction Record □ Pile Test Report Conclusion Note:If no pile or manual shore is involved in the civil work,the blank for Item 4 shall be crossed out. Owner/Supervision Contractor Discipline engineer: Date: Date: Design/General Contractor Discipline engineer: Survey Contractor Construction Contractor Discipline engineer: Discipline engineer: Date: Quality inspector: Prepared by: Date: SH/T 3503—2007

B.1 SH/T3503-J201“地基验槽(坑)记录”。构筑物均应进行施工验槽,检查内容包括基坑位置、平面尺寸、持力层核查、基底绝对高程和相对标高、基坑土质及地下水位等,有桩支护或桩基的工程还应填写桩的检查状况。地基验槽检查记录应由建设/监理、勘察、设计和施工单位共同验收签认。“检验结论”栏原则上应由勘察单位人员填写。若勘察或设计等单位委托监理单位执行该工作,应有相关的书面委托文件。地基验槽未通过,需要进行地基处理,应由勘察单位人员提出、设计单位出具处理意见和做法。

因篇幅问题不能全部显示,请点此查看更多更全内容

Copyright © 2019- 7swz.com 版权所有 赣ICP备2024042798号-8

违法及侵权请联系:TEL:199 18 7713 E-MAIL:2724546146@qq.com

本站由北京市万商天勤律师事务所王兴未律师提供法律服务